|
|
JOB
LOCATION
|
PROJECT
NAME
|
COMPLETION
DATE
|
|
|
Jacksonville, NC |
CCCC-Skills Building-Diesel Shop
Ventilation Renovation |
2009 |
|
|
Camp Johnson, NC |
Repair Boiler 74, Building M625 |
2009 |
|
|
Camp Lejeune, NC |
MACC Seed Project: Building 315
Add Heat Pumps |
2009 |
|
|
MCAS New River, NC |
Replace Steam Systems, AS100,
AS4000, AS4035 & AS236 |
2009 |
|
|
Camp Lejeune, NC |
Expand Vehicle Exhaust System,
Various Buildings |
2009 |
|
|
MCAS New River, NC |
Install Dust Collection Systems,
AS4108, AS265, AS504, AS515, AS3905, AS4100 and AS4106 |
2009 |
|
|
Jacksonville, NC |
ER & Surgical Services
Pavilion-Existing Building Renovations |
2009 |
|
|
Camp Lejeune, NC |
Major Interior/Exterior Repairs,
Building 102 |
2009 |
|
|
Camp Lejeune, NC |
Repair Infrastructure, Building
326 |
2009 |
|
|
MCAS New River, NC |
Replace Steam Line Support Cables |
2009 |
|
|
Camp Lejeune, NC |
Major Interior/Exterior Repairs,
BEQ FC360 |
2009 |
|
|
Camp Lejeune, NC |
Structural and HVAC Renovations
to BEQ FC571 |
2009 |
|
|
Camp Lejeune, NC |
Replace Deaerator Tank, Building
RR-15 |
2009 |
|
|
Cherry Point, NC |
Replace AHU's at NH Clinic |
2009 |
|
|
Camp Lejeune, NC |
Chiller Replacement, Various
Buildings |
2009 |
|
|
Camp Lejeune, NC |
Major Interior/Exterior Repairs,
BEQ HP225 |
2009 |
|
|
Camp Lejeune, NC |
Major Interior/Exterior Repairs,
BEQ HP215 |
2009 |
|
|
Camp Lejeune, NC |
Renovate Building RR-8 |
2009 |
|
|
Jacksonville, NC |
Onslow Emergency and Surgical
Services Pavillion |
2008 |
|
|
Camp Lejeune, NC |
Mechanical & HVAC Renovations to
Bldg 520 & Modify HVAC System, Bldg 2617 |
2008 |
|
|
Camp Lejeune, NC |
Major Interior/Exterior Repairs,
BEQ HP-550 |
2008 |
|
|
Camp Lejeune, NC |
Interior/Exterior Repairs, M318 |
2008 |
|
|
Camp Lejeune, NC |
Major Interior/Exterior Repairs,
Bldg 1404 |
2008 |
|
|
Camp Lejeune, NC |
Building 1005 Additions |
2008 |
|
|
Camp Lejeune, NC |
Renovate Building 712 |
2008 |
|
|
Camp Lejeune, NC |
NH-100, Water & Sprinkler System
Repairs, Chiller Replacement at Building 15 |
2008 |
|
|
Camp Lejeune, NC |
Renovate HVAC System, Building 41 |
2008 |
|
|
Camp Lejeune, NC |
Major Interior/Exterior Repairs,
Building 507 |
2008 |
|
|
MCAS New River, NC |
Waste Water Treatment Plant, MCAS
New River |
2008 |
|
|
Camp Lejeune, NC |
Design/Builid, Courthouse Bay
Dining Facility |
|
|
|
Cherry Point, NC |
Replace Sand Filters, Combat
Pool, B-3383 |
2008 |
|
|
Cherry Point, NC |
Replace Heating Boiler, B-1787 |
2008 |
|
|
Camp Lejeune, NC |
Relocate FATS from BB11 to BB6 |
2008 |
|
|
Cherry Point, NC |
Install Potable Water
Sampler/Flushing Units |
2008 |
|
|
Camp Lejeune, NC |
Design/Build, French Creek
Bachelor Enlisted Quarters |
2007 |
|
|
Camp Lejeune, NC |
Replace Insulation on Steam Main
to Hospital Point |
2007 |
|
|
Camp Lejeune, NC |
Replace Shower Floors, Various
Buildings |
2007 |
|
|
Camp Lejeune, NC |
P1025 Assault Breacher Vehicle
Maintenance Shop |
2007 |
|
|
Camp Lejeune, NC |
Repairs to Mess Halls, Buildings
FC303, FC420, G640 & BB7 |
2007 |
|
|
Camp Lejeune, NC |
Replace HVAC System Complete,
FC560 |
2007 |
|
|
Camp Lejeune, NC |
Replace HVAC System, Building
FC500 |
2007 |
|
|
Camp Lejeune, NC |
Repairs to Paradise Point
Officer's Pool, S-2632 |
2007 |
|
|
MCAS New River, NC |
Interior/Exterior Repairs, Hangar
AS515 |
2007 |
|
|
Camp Lejeune, NC |
Replace Windows in Building H14 |
2007 |
|
|
Piver's Island, NC |
NOAA Administrative & Laboratory
Building |
2007 |
|
|
MCAS New River, NC |
Design/Build, Building AS-318,
Flight Simulator |
2007 |
|
|
Piver's Island, NC |
Design/Build, Ocean Science
Teaching Center, Duke University |
2007 |
|
|
Cherry Point, NC |
Replace HVAC, B-4247 |
2007 |
|
|
Cherry Point, NC |
Install Continuous Opacity
Monitors on #1 & #2 Boilers, B-152 |
2007 |
|
|
Camp Lejeune, NC |
Install A/C & Dry Ice Machine,
Repairs to Concrete, NH100 |
2007 |
|
|
MCAS New River, NC |
Install Standing Seam Metal Roof,
AS-214 |
2007 |
|
|
Camp Lejeune, NC |
Install Security Cages, Modular
Offices & Renovate Head, 1117 |
2007 |
|
|
Camp Lejeune, NC |
HVAC Renovation, SH8 |
2007 |
|
|
Camp Lejeune, NC |
Replace Rooftop HVAC, Building
1231 |
2007 |
|
|
Camp Lejeune, NC |
Renovate HVAC, Building 2615,
Officer's Club |
2007 |
|
|
Cherry Point, NC |
Wildland Fire Management (Non
Potable Water Well) |
2007 |
|
|
Camp Lejeune, NC |
FSRG Operations & Maintenance
Buildings |
2007 |
|
|
Piver's Island, NC |
NOAA Administrative & Laboratory
Building |
2007 |
|
|
Piver's Island, NC |
Ocean Science Teaching Center |
2007 |
|
|
Camp Lejeune, NC |
Add AC to UPS Room, Building 24 |
2006 |
|
|
Camp Lejeune, NC |
Replace HVAC, Building 415 |
2006 |
|
|
Camp Lejeune, NC |
Install Insulation in Boiler
Room, NH100 |
2006 |
|
|
Camp Lejeune, NC |
Replace HVAC Complete, FC565 |
2006 |
|
|
Camp Lejeune, NC |
Construct Dog Kennels @ PT37 |
2006 |
|
|
Camp Lejeune, NC |
Replace Pipe Insulation, NH100 |
2006 |
|
|
Cherry Point, NC |
Replace HVAC Systems, Bldg 198 |
2006 |
|
|
Cherry Point, NC |
Repairs to Hangar 131 |
2006 |
|
|
Camp Lejeune, NC |
TT Housing, 675 Units Replacement
(Plumbing) |
2006 |
|
|
Camp Lejeune, NC |
Midway Park Housing, 161 Units
Replacement (HVAC) |
2006 |
|
|
Camp Lejeune, NC |
Hospital LDRP Renovations, NH-100 |
2006 |
|
|
Cherry Point, NC |
Replace HVAC Systems, Bldg 294 |
2006 |
|
|
Camp Lejeune, NC |
Fuel Facilities Upgrade |
2006 |
|
|
Camp Lejeune, NC |
Replace Lift Stations, S47 & S47A |
2006 |
|
|
Camp Lejeune, NC |
Replace Boilers, RR-15 |
2005 |
|
|
Greenville, NC |
Fletcher & Tyler Dormitory, East
Carolina University |
2005 |
|
|
Camp Lejeune, NC |
Replace Chillers Basewide |
2005 |
|
|
Camp Lejeune, NC |
Interior/Exterior Repairs, Bldg
425 |
2005 |
|
|
Camp Lejeune, NC |
Miscellaneous Mess Hall Repairs,
RR-3 |
2005 |
|
|
Camp Lejeune, NC |
Replace Condensate Lines,
Industrial and Regimental Areas |
2005 |
|
|
Cherry Point, NC |
Repair Ventilation System, Bldg
137 |
2005 |
|
|
Camp Lejeune, NC |
Replace Sanitary Lift Station
STFM102, Camp Devil Dog |
2005 |
|
|
Cherry Point, NC |
Aircraft Stripping Facility |
2005 |
|
|
UNC-W,
Wilmington, NC |
Infrastructure Expansion, Phase III, Central Energy Plant Project |
2005 |
|
|
Cherry Point, NC |
Replace Steam & Condensate Lines,
6th Avenue |
2005 |
|
|
Camp Lejeune, NC |
Replace HVAC System, Building 66 |
2004 |
|
|
Camp Lejeune, NC |
Connect Oil Separators to
Sanitary Sewer |
2004 |
|
|
Camp Lejeune, NC |
Major Repairs to UEPH, AS-4030 |
2004 |
|
|
Camp Lejeune, NC |
Replace Lift Stations, S-2633,
H-29 & SE-23 |
2004 |
|
|
Camp Lejeune, NC |
Replace Vavles, Controls & Piping
in Water Treatment Plant 670 |
2004 |
|
|
Camp Lejeune, NC |
Miscellaneous Repairs, Bldg 20 |
2004 |
|
|
Camp Lejeune, NC |
Replace HVAC Systems, HP
Buildings |
2004 |
|
|
Camp Lejeune, NC |
Major Interior/Exterior Repairs,
FC304, FC305 & HP155 |
2004 |
|
|
New River MCAS, NC |
Replace Dual Temp Piping, AS705 &
AS211 |
2004 |
|
|
Jacksonville, NC |
Geothermal Heat Pump Replacement,
Coastal Carolina Community College |
2004 |
|
|
Jacksonville, NC |
Brynn Marr Treatment Facility |
2004 |
|
|
|
|
|
|
|