***Important***
Master Mechanical MACC Specifications
These are the master specifications for the current Mechanical MACC contract. If a project
is not issued with specifications, these specifications are to be
used.
| Job Number | Bid Date | Title and Location | Drawings and Specs | Amendments |
| CP0936M | 3/9/10 2:00 PM |
Replace Paint
Booth, B-250 (Cherry Point Mechanical MACC) Contract Duration: 300 Days ***Site visit 2/2/10 @ 9am. Meet at ROICC Office.*** |
Drawings Specifications |
Amendment1 Bid Pushed Back to 3/4 Amendment2 Amend2Drwgs |
| 09-0179 | 3/12/10 10:00 AM |
Correct Sewage
Flow STT30 & STT47 (Mechanical MACC) Contract Duration: 360 Days |
Drawings Specifications |
|
| 10-0446 | 3/17/10 2:00 PM |
Abate Asbestos and
Replace Hot Water Heater, M413 (Mechanical MACC) Contract Duration: 90 Days |
Scope of Work | Amendment1 |
| 09-0148 | 3/18/10 1:00 PM |
Repair Combat
Training Pool, Bldg 236 (HUBZone MACC) Contract Duration: 360 Days |
***Bid
Form*** Drawings Specifications |
|
| 3/25/10 12:00 PM |
New Elementary
School (General Bid) Contract Duration: 14 months |
95% Specs & Drawings
Civil Drawings |
||
| N40085-10-R-5300 | 4/2/10 12:00 PM |
P031 Multi-Purpose
Machine Gun Range (General Bid) |
*Bid all buildings separately.*
Solicitation For All Other Drawings go to: |
Amendment1 Amend1Drawings New Bid Form Amendment2 |
| 09-0149 | Project Bid. Awaiting Bid Results | Repair Applied
Instruction Building, BB-48 (SDVO MACC) Contract Duration: 360 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amend3Drawings Amendment4 Amendment5 |
| 10-0445 | Project Bid. Awaiting Bid Results | Replace HVAC in
Bldg M-116 (Mechanical MACC) Contract Duration: 120 Days |
Drawings Scope of Work |
Amendment1 Amendment2 Amendment3 |
| 09-0042 | Project Bid. Awaiting Bid Results | Add Storage and
Heads to Building, BB-6 (SDVO MACC) Contract Duration: 210 Days |
Drawings Specifications |
Amendment1 Amendment2 |
| 5209455 | Project Bid. Awaiting Bid Results | Mechanical
Cleaning of Fireside and Waterside Tube on #3 and #4 Boiler, Central Heat
Plant, B-152 (Cherry Point Mechanical MACC) Contract Duration: 90 Days |
Scope of Work |
Amendment1 Amendment2 Amendment3 |
| 06-0054 | Project Bid. Awaiting Bid Results | Major
Interior/Exterior Repairs to BEQ HP445 (GC MACC) Contract Completion Date: 3/1/11. Scheduling: Contractor will not be allowed to begin construction work at the site until 6/1/10. |
Bid Item 0001: All work associated with the renovation of Bldg HP445 except for that listed for Bid Item 0002. Bid Item 0002: |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amendment7 Amendment8 Amendment9 Amendment10 Amendment11 Amendment12 Amendment13 Amendment14 Amendment15 Amendment16 Amendment17 Amendment18 |
| 09-0068 | Project Bid. Awaiting Bid Results | Interior &
Exterior Repairs, Building HP-105 (HUBZone MACC) Contract Completion Date: 3/1/11 Scheduling: Contractor will not be allowed to begin construction work at the site until 6/1/10. |
Bid Item 0001: All work associated with the renovation of Bldg HP105 except for the work listed in Bid Item 0002. Bid Item 0002: |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amendment7 Amendment8 |
| 10-0025 | Project Bid. Awaiting Bid Results | AS-515 Electrical
Upgrades Contract Duration: 270 Days |
Drawings Specifications |
Amendment1 Amendment2 |
| WR5103102 | Project Bid. Awaiting Bid Results | Replace P-50 Pump,
Building 1005 (Cherry Point Mech MACC) Contract Duration: 60 Days ***Site visit 2/9/10 @ 9am. Meet at ROICC Office.*** |
Scope of Work | |
| 09-0153 | Project Bid. Awaiting Bid Results | Repair Medical
Instruction Building M104 (HUBZone MACC) Contract Duration: 300 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 |
| 09-0125 | Project Bid. Awaiting Bid Results | Major
Interior/Exterior Repairs, Building M-327 (HUBZone MACC) Contract Duration: 300 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amendment7 |
| WR5017923 | Project Bid. Awaiting Bid Results | Replace HVAC UMAC
Office, B-87 (Mechanical MACC) Contract Duration: 45 Days |
Drawings Scope of Work |
Amendment1 Amendment2 Mech Room Panel SE Tile Replacement |
| FEMA-59642 | Project Bid. Awaiting Bid Results | B-137 Rearrange
Component Clean Shop (General MACC) Contract Duration: 84 Days |
Drawings Scope of Work Bid Sheet |
RFI#1 Amendment1 Amendment2 Amendment3 |
| 4910317 | Project Bid. Awaiting Bid Results | Replace Air Dryer
Systems, B-4380 (Mechanical MACC) Contract Duration: 90 Days |
Scope of Work | |
| 09-0295 | Project Bid. Awaiting Bid Results | Major
Interior/Exterior Repairs, Building M303 (GC MACC) Contract Duration: 180 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 |
| CP0829M | Project Bid. Awaiting Bid Results | Repair B-298 (GC MACC) Contract Duration: 360 Days ***Site Visit 9/10 @ 9am. Meet at ROICC Office.*** |
Drawings Specifications |
RFI#1 RFI#2 RFI#3 RFI#4 Amendment1 |
| 4831293 | Project Bid. Awaiting Bid Results | Replace Wastewater
Pump Station, B-3879 (Mechanical MACC) Contract Duration: 300 Days ***Site visit 8/13 @ 10am. Meet @ Bldg 163 (ROICC Office).*** |
Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 |
| 08-0161 | Project Bid. Awaiting Bid Results | SMTC Small Boat
Simulator PEB (General MACC) Contract Duration: 270 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amendment7 Amendment8 Amend9Part1 Amend9Part2 Amendment10 Amendment11 Amendment12 Amendment13 |
| 06-0067 | Project Bid. Awaiting Bid Results | Replace
Underground FRP Condensate Return Lines, 400 Area (Mechanical MACC) Contract Duration: |
Drawings Specifications |
Amendment1 |
| Project Bid. Awaiting Bid Results | Radiation Oncology
Pavilion (General Bid) Contract Duration: |
Plumbing Drawings Mechanical Drawings CT-M101 LA-M101 General Drawings Civil Drawings Structural Drawings Architectural Drawings Fire Protection Drawings Electrical Drawings CT Simulator Equip Drwgs Linear Accelerator Equip Drwgs Specs-Volume 1 Specs-Volume 2 |
Amendment1 Amendment2 Amendment3 |
|
| WR4656615 | Project Bid. Awaiting Bid Results | Install New Mixers
in RAS/WAS Wet Wells, B-4376 (GC MACC) Contract Duration: 180 Days |
Scope of Work | |
| WO4341454 | Project Bid. Awaiting Bid Results | Replace Roof and
Monitor Windows, B-147 (HUBZone MACC) Contract Duration: 375 Days |
Drawings Specifications |
Amendment1 Amendment2 |
| R14-03 | Project Bid. Awaiting Bid Results | Reroof Building
4032 (Roofing MACC) Contract Duration: 180 Days |
Drawings Specifications |
|
| 08-0152 | Project Bid. Awaiting Bid Results | Renovate BOQ 2611 (CLNC GC MACC) Contract Duration: 210 Days *** Work will not begin prior to June 1, 2009*** |
Drawings ReferenceDrawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amendment7 Amendment8 Amendment9 Amendment10 |
| CP0902M | Project Bid. Awaiting Bid Results | Replace HVAC &
Roof, B-3898 (GC MACC) Contract Duration: 365 Days |
Drawings Specifications |
Amendment1 |