Available Plans
Adobe Acrobat Reader required to view downloads get it here |
Humphrey Mechanical, Inc. encourages all woman-owned, small disadvantaged, HUBZone, veteran-owned and
service disabled veteran-owned small businesses to provide quotations for all jobs that we are bidding.
Humphrey Mechanical, Inc. is an equal opportunity employer.
| Job Number | Bid Date | Title and Location | Drawings and Specs | Amendments |
| 08/1414 |
8/20/08 10:00 AM |
Design/Build P1096
Child Development Center (CLNC 8A MACC) Contract Duration: 555 Days |
Specifications GeoTech Report |
Amendment1 Floor Plan Amendment2 Amendment3 Amendment4 |
| RM60808 |
8/21/08 2:00 PM |
Repair High
Pressure Steam Line, B-137 (Cherry Point Mech MACC) Contract Duration: 60 Days |
Drawings Specifications |
|
| 99-4236 |
8/26/08 3:00 PM |
Major
Interior/Exterior Repairs, HQ Building FC400 (CLNC Mech MACC) Contract Duration: 540 Days |
Title & Civil
Drawings Civil Drawings Arch & Struct Drawings FP,P,M&E Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amendment7 |
| 08-0500 |
8/27/08 1:00 PM |
Building 437 HVAC
Renovations & Replace Deep Fat Fryer Exhaust System at Building 211 (CLNC Mech MACC) Contract Duration: Bldg 437-180 Days Bldg 211-90 Days ***This project is an FY08 Straddle Project; proposal prices shall be valid for 180 days after receipt of proposals.*** ***Special conditions for Bldg 211-All material must be on-site prior to starting work. Coordinate with Mess Hall personnel is required; kitchen must remain operational during construction. Contractor shall verify all existing dimensions.*** |
Bid Form Scope of Work Drawings |
Amendment1 |
| 08-0185 |
8/27/08 2:00 PM |
P1220B Electric
Infrastructure Improvement, Wallace Creek (CLNC Mech MACC) Contract Duration: 180 Days ***Pre-proposal conference-Monday, August 11 @ 9AM. Meet at Conference Room of Bldg 1005. Site visit will follow. |
Drawings |
Amendment1 Amendment2 |
| 04-2364 |
8/28/08 2:00 PM |
Replace FRP
Condensate Return Lines FC100 & FC200 (CLNC Mech MACC) Contract Duration: 365 Days Steam must stay operatoinal during construction. Provide two 10 hour steam outages & one 8 hour outage to reroute steam & condensate pipe where indicated. See drawing sheet M-03A. |
Drawings Specifications Ref Drwgs 1of2 Ref Drwgs 2of2 |
|
| 08-0504 |
8/29/08 1:00 PM |
Building 520
Electrical Modifications (CLNC Mech MACC) Contract Duration: 150 Days ***This project is an FY08 Straddle Project. Proposals must be valid for 180 days after receipt of proposals. Some work to be accomplished within an ACM area.*** |
Scope of Work Drawings |
|
| 08-0115 |
9/3/08 3:00 PM |
M231 Boiler Plant
Building (CLNC Mech MACC) Contract Duration: 180 Days Contractor must provide temp domestic hot water for domestic water outages lasting longer than 8 hours. ***This project is a FY08 Straddle Project. Proposals for this project will not expire until 180 days after receipt of proposals.*** |
Drawings Specifications Ref Drwgs |
|
| 2694331 |
9/10/08 2:00 PM |
Repairs to B-160,
Cherry Point (GC MACC) Contract Duration: 360 Days |
Drawings1of2 Drawings2of2 Specifications |
|
| 08-0085 | Project Bid. Awaiting Bid Results | Installation of
E85 Tank (CLNC Mech MACC) Contract Duration: 240 Days |
Drawings Specifications |
Amendment1 Amendment2 |
| RM118-06 | Project Bid. Awaiting Bid Results | Upgrade Hazardous
Gas Detection System, B-4225 (Cherry Point Mech MACC) Contract Duration: 240 Days |
Drawings Specifications |
Amendment1 |
| CP0715R | Project Bid. Awaiting Bid Results | Replace Paint
Booth, B-131 (Cherry Point Mech MACC) Contract Duration: 300 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 |
| N40085-08-B-8459 | Project Bid. Awaiting Bid Results | TECOM (SOI)
Interim Facilities at Camp Geiger (CLNC Small Business Set Aside) Contract Duration: 300 Days |
Drawings Specifications |
Amendment1 |
| 08-0002 | Project Bid. Awaiting Bid Results | Major
Interior/Exterior Repairs, BEQ HP-560 (CLNC Mech MACC) Contract Duration: 365 Days Contractor may not begin work in the building until 1/15/09. This is a FY08 straddle project. Proposals for this project will not expire until 180 days after receipt of proposals. |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 |
| 08-0491 | Project Bid. Awaiting Bid Results | Replace
Underground Cables Along Curtis Road (CLNC Mech MACC) Contract Duration: 120 Days |
Scope of Work Drawings |
Amendment1 |
| 08-0009 | Project Bid. Awaiting Bid Results | HVAC Repairs to
HP200 Area Barracks (CLNC Mech MACC) Contract Duration: 270 Days |
Drawings Specifications |
Amendment1 Amendment2 |
| 08-0050 | Project Bid. Awaiting Bid Results | HVAC Repairs,
HP235 and HP245 (CLNC Mech MACC) Contract Duration: 270 Days ***Dual temp system will remain in operation for the duration of the project except for a 2 week period when modifications are made to the central chiller plant. Only 1 AHU per bldg may be taken off-line for replacement at a time throughout the duration of the project. |
Drawings Specifications |
Amendment1 Amendment2 |
| 08-0134 | Project Bid. Awaiting Bid Results | Lighting For
Playing Fields Near Building 40 (CLNC Mech MACC) Contract Duration: 120 Days |
Drawings | Amendment1 |
| WR4449318 | Project Bid. Awaiting Bid Results | Replace Compressor
Cooling System, B-250 (Cherry Point Mech MACC) Contract Duration: 90 Days |
Scope of Work | Amendment1 |
| N40085-08-R-8443 | Project Bid. Awaiting Bid Results | Seed Project:
Building 315 Add Heat Pumps (CLNC Mech Seed Project) Contract Duration: 180 Days |
Drawings Specifications Proposal Documents |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 |
| 07-0180 | Project Bid. Awaiting Bid Results | Electrical &
Mechanical Upgrades, Building 24 (CLNC Mech MACC) Contract Duration: See Amendment #1. Electrical outages shall be closely coordinated. |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 |
| WR3608525 | Project Bid. Awaiting Bid Results | Replace HVAC
Systems, B-3452 (Cherry Point Mech MACC) Contract Duration: 240 Days |
Drawings Specifications |
|
| 08-0426 | Project Bid. Awaiting Bid Results | Replace AC System,
AS204 (CLNC Mech MACC) Contract Duration: 180 Days |
Scope of Work Drawings |
Amendment1 Amendment2 |
| C01-01 | Project Bid. Awaiting Bid Results | Repairs to
Industrial Waste System, B-137 (Cherry Point Mech MACC) Contract Duration: 330 Days |
Drawings Specifications |
Amendment1 Amend1Drwgs Amend1Specs Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 |