Available Plans
Adobe Acrobat Reader required to view downloads get it here |
Humphrey Mechanical, Inc. encourages all woman-owned, small disadvantaged, HUBZone, veteran-owned and
service disabled veteran-owned small businesses to provide quotations for all jobs that we are bidding.
Humphrey Mechanical, Inc. is an equal opportunity employer.
***Important***
Master Mechanical MACC Specifications
These are the master specifications for the current Mechanical MACC contract. If a project
is not issued with specifications, these specifications are to be
used.
| Job Number | Bid Date | Title and Location | Drawings and Specs | Amendments |
| 10-0129 | 7/29/10 10:00 AM |
Sanitary Sewer
Installation, CHB (Camp Lejeuen Mechanical MACC) Contract Duration: 90 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 |
| 7/29/10 12:00 PM |
Pender County
Surface Water Treatment Facility (General Bid) Contract Duration: 720 Days |
Plumbing Drawings HVAC Drawings Plumbing Specifications HVAC Specifications |
Amendment1 Amend1Drwg Amendment2 Amendment3 Amendment4 Amendment5 |
|
| N40085-10-R-5305 | 7/29/10 2:00 PM |
P1857-Hospital
Addition & P1331-Naval Hospital Renovation & MRI Addition (General Bid) Contract Duration: P1857-835 Days After Notice to Proceed P1331-Begin Work 4/14/10 & Completed Work by 1/2/15. |
RFP P1331 Information Specs-Volume 1 Specs-Volume 2 Specs-Volume 3 General Drawings 1of5 General Drawings 2of5 General Drawings 3of5 General Drawings 4of5 General Drawings 5of5 Civil Drawings 1of2 Civil Drawings 2of2 Landscaping Drawings Structural Drawings Telecomm Drawings 1of3 Telecomm Drawings 2of3 Telecomm Drawings 3of3 Fire Protection Drawings 1of2 Fire Protection Drawings 2of2 Life Safety Drawings Architectural Drawings 1of8 Architectural Drawings 2of8 Architectural Drawings 3of8 Architectural Drawings 4of8 Architectural Drawings 5of8 Architectural Drawings 6of8 Architectural Drawings 7of8 Architectural Drawings 8of8 Volume 3 General Drawings Mechanical Drawings 1of7 Mechanical Drawings 2of7 Mechanical Drawings 3of7 Mechanical Drawings 4of7 Mechanical Drawings 5of7 Mechanical Drawings 6of7 Mechanical Drawings 7of7 Plumbing Drawings 1of4 Plumbing Drawings 2of4 Plumbing Drawings 3of4 Plumbing Drawings 4of4 Electrical Drawings 1of5 Electrical Drawings 2of5 Electrical Drawings 3of5 Electrical Drawings 4of5 Electrical Drawings 5of5 P1857 Information |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amend5Drwgs1of2 Amend5Drwgs2of2 Amend5P1857Civil Drwgs Amend5P1857ArchDrwgs Amend5P1857PlumbDrwgs Amend5P1857ElectDrwgs1of2 Amend5P1857ElectDrwgs2of2 Amendment6 Amend6P1331Files Amend6P1857Drawings1of2 Amend6P1857Drawings2of2 Amendment7 Amend7ZipFile1of3 Amend7ZipFile2of3 Amend7ZipFile3of3 Amendment8 Amend8Attach1of2 Amend8Attach2of2 Amend8P1331ArchDrawings Amend8P1331MechDrawings Amend8P1857ArchDrawings |
| #5498393 | 8/3/10 2:00 PM |
Replace Refractory
Around Tubes in Firebox #2 Boiler, Central Heat Plant, B-152 (Cherry Point Mechanical MACC) Contract Duration: 60 Days ***Site Visit-7/27 @ 9am. Meet at ROICC Office.*** |
Scope of Work | |
| #WO5543409 | 8/12/10 2:00 PM |
V-22 Nacelle
Blower Facility Modifications (Cherry Point Mechanical MACC) Contract Duration: 60 Days ***Site Visit-8/3 @ 9am. Meet at ROICC Office.*** |
Drawings Specifications |
|
| N40085-10-R-5334 | 8/20/10 2:00 PM |
P1136 Modification
of K-Ranges, Phase II (General Bid) Contract Duration: 555 Days |
RFP Civil Drawings1of4 Civil Drawings2of4 Civil Drawings3of4 Civil Drawings4of4 Architectural Drawings1of1 Structural Drawings1of1 Mechanical Drawings1of1 Electrical Drawings1of2 Electrical Drawings2of2 Specifications1of6 Specifications2of6 Specifications3of6 Specifications4of6 Specifications5of6 Specifications6of6 |
Amendment1 |
| 09-0125 | Project Bid. Awaiting Bid Results | Construct EMD
Storage Building (Service Disable Veteran Owned MACC) Contract Duration: 270 Days |
Drawings Specifications |
Amendment1 Amendment2 |
| Project Bid. Awaiting Bid Results | Pender County
Surface Water Treatment Plant (General Bid) Contract Duration: 365 Days |
Plumbing Drawings HVAC Drawings Plumbing Specifications HVAC Specifications |
Amendment1 Amend1Drwg Amendment2 |
|
| #WR5026720 | Project Bid. Awaiting Bid Results | Install HVAC
System, US Army Veterinarians Office, Building 293 (Cherry Point Mechanical MACC) Contract Duration: 120 Days |
Drawings Specifications |
Amendment1 |
| #5051122 | Project Bid. Awaiting Bid Results | Modification to
HVAC System, B-4472 (Cherry Point Mechanical MACC) Contract Duration: 60 Days |
Scope of Work |
Amendment1 Amend1Drwgs |
| #WR5017960 | Project Bid. Awaiting Bid Results | Replace Computer
Room HVAC Units, B-4035 (Cherry Point Mech MACC) Contract Duration: 120 Days |
Scope of Work |
Amendment1 Amend1Drwgs |
| 09-0205 | Project Bid. Awaiting Bid Results | Renovation of
Galley, Building NH100 (HUBZone MACC) Contract Duration: 450 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amendment7 Amendment8 Amendment9 |
| #5522448 | Project Bid. Awaiting Bid Results | Repair Pista Grit
System #2, Sewer Treatment Plant, B-4376 (Cherry Point Mechanical MACC) Contract Duration: 30 Days |
Scope of Work | Amendment1 |
| Project Bid. Awaiting Bid Results | Housing
Privatization Phase III, MCB Camp Lejeune, NC (General Bid) |
***Owner Provided Bid Form Must Be Used When
Providing Pricing*** Bid Form Specifications Sprinkler Specs Civil Drawings1 Civil Drawings2 Civil Drawings3 Civil Drawings4 Architectural Structural Plumbing Mechanical Sprinkler Electrical |
Amendment1 Amendment2 RFI's |
|
| UREG-10-R-0011 | Project Bid. Awaiting Bid Results | Battle Command
Training Center, Fort Bragg (General Bid) Contract Duration: 540 Days |
Specs Drawings Volume 1 Drawings Volume 2 |
Amendment1 Amendment2 Amendment3 Amendment4 Amend4Specs1of3 Amend4Specs2of3 Amend4Specs3of3 Amend4Drwgs |
| #5169134 | Project Bid. Awaiting Bid Results | Replace Pumps &
Controls, Lift Station, B-4188 (Cherry Point Mechanical MACC) Contract Duration: 120 Days |
Scope of Work | |
| N40085-10-R-5306 | Project Bid. Awaiting Bid Results | P1268-SOI East
Facilities, MCB Camp Lejeune, NC Design Build/Design Bid Build MACC Seed Project (Design Build Project) Contract Duration: 754 Days |
Phase 1 RFP Phase 2 RFP |
Amednment1 Amendment2 Amendment3 Amendment4 Amend4RFP Drawings Amendment5 Amendment6 Amendment7 Amendment8 Amend8Attach1of3 Amend8Attach2of3 Amend8Attach3of3 Amendment9 Amendment10 Amendment11 Amendment12 Amendment13 Amendment14 |
| WO5183146 | Project Bid. Awaiting Bid Results | Replace HVAC at
New City Deli, B-4505 (Cherry Point Mechanical MACC) Contract Duration: 120 Days |
Drawings Specifications |
Amendment1 |
| N40085-10-R-5310 | Project Bid. Awaiting Bid Results | P1269-Field
Training Facilities, Camp Devil Dog Design Build-Admin MACC (Design Build Project) Work cannot begin until June 1, 2011 |
RFP 1of2 RFP 2of2 RFP Sketches |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amend6Drwgs |
| #10014 | Project Bid. Awaiting Bid Results | HVAC Replacements,
White Oak High School (General Bid) Start Date: 6/16/2010. Completion Date: 9/30/2010. |
Drawings Specifications |
|
| ID# 07-07399-03B | Project Bid. Awaiting Bid Results | Union Station
Parking Deck, Cape Fear Community College (General Bid) Project Duration: |
Drawings Specifications |
Amendment1 Amend1Drawing |
| WO50183174 | Project Bid. Awaiting Bid Results | Provide
Electrical/Mechanical/Architectural Modifications to B-4414 for a CNATT
Network Relocation (Cherry Point Mechanical MACC) Contract Duration: 60 Days |
Scope of Work Drawings |
|
| WR5324584 | Project Bid. Awaiting Bid Results | Modify the Control
of the Water Level and Pressure in the Hydro-Pneumatic Tank as well as the
Water Level Control of the Wet-Well at the Water Treatment Plant, B-9058 at
BT-11 (Cherry Point Mechanical MACC) Contract Duration: 120 Days |
Scope of Work | |
| 10-0473 | Project Bid. Awaiting Bid Results | HVAC Replacement,
Building 538 (Mechanical MACC) Contract Duration: 90 Days |
Scope of Work Maximo Report |
|
| 10-0463 | Project Bid. Awaiting Bid Results | Clean Leachate
Lines, Landfill, Building 981 (Mechanical MACC) Contract Duration: 60 Days All work shall be performed during normal working hours 7am to 4pm Monday-Friday. Contact Joe Power (Landfill Supervisor) @ 451-4998 to schedule access to site. Landfill supervisor shall be notified 1 week prior to commencement of work. |
Scope
of Work Attachments |
|
| M00146-10-T-9018 | Project Bid. Awaiting Bid Results | Design/Build
Aluminum Oxide Blast Booth Facility, MCAS Cherry Point (General Bid) |
For all bidding documents go to: | |
| 09-0280 | Project Bid. Awaiting Bid Results | Replace HVAC at
Building AS-4141 (Mechanical MACC) Contract Duration: 240 Days |
Drawings Specifications |
Amendment1 |
| 10-0452 | Project Bid. Awaiting Bid Results | AS318 Install AC
to CMS PTT Classroom (Mechanical MACC) Contract Duration: 90 Days |
Drawings Maximo Report |
Amendment1 |
| 10-0446 | Project Bid. Awaiting Bid Results | Replace Hot Water Heater, M413 (Mechanical MACC) Contract Duration: 90 Days |
Scope of Work |
Amendment1 Amendment2 |
| 09-0042 | Project Bid. Awaiting Bid Results | Add Storage and
Heads to Building, BB-6 (SDVO MACC) Contract Duration: 210 Days |
Drawings Specifications |
Amendment1 Amendment2 |
| WR5103102 | Project Bid. Awaiting Bid Results | Replace P-50 Pump,
Building 1005 (Cherry Point Mech MACC) Contract Duration: 60 Days ***Site visit 2/9/10 @ 9am. Meet at ROICC Office.*** |
Scope of Work | |
| 09-0153 | Project Bid. Awaiting Bid Results | Repair Medical
Instruction Building M104 (HUBZone MACC) Contract Duration: 300 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 |
| 09-0125 | Project Bid. Awaiting Bid Results | Major
Interior/Exterior Repairs, Building M-327 (HUBZone MACC) Contract Duration: 300 Days |
Drawings Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 Amendment5 Amendment6 Amendment7 |
| WR5017923 | Project Bid. Awaiting Bid Results | Replace HVAC UMAC
Office, B-87 (Mechanical MACC) Contract Duration: 45 Days |
Drawings Scope of Work |
Amendment1 Amendment2 Mech Room Panel SE Tile Replacement |
| 4910317 | Project Bid. Awaiting Bid Results | Replace Air Dryer
Systems, B-4380 (Mechanical MACC) Contract Duration: 90 Days |
Scope of Work | |
| 4831293 | Project Bid. Awaiting Bid Results | Replace Wastewater
Pump Station, B-3879 (Mechanical MACC) Contract Duration: 300 Days ***Site visit 8/13 @ 10am. Meet @ Bldg 163 (ROICC Office).*** |
Specifications |
Amendment1 Amendment2 Amendment3 Amendment4 |
| 06-0067 | Project Bid. Awaiting Bid Results | Replace
Underground FRP Condensate Return Lines, 400 Area (Mechanical MACC) Contract Duration: |
Drawings Specifications |
Amendment1 |
| WR4656615 | Project Bid. Awaiting Bid Results | Install New Mixers
in RAS/WAS Wet Wells, B-4376 (GC MACC) Contract Duration: 180 Days |
Scope of Work | |
| WO4341454 | Project Bid. Awaiting Bid Results | Replace Roof and
Monitor Windows, B-147 (HUBZone MACC) Contract Duration: 375 Days |
Drawings Specifications |
Amendment1 Amendment2 |
| R14-03 | Project Bid. Awaiting Bid Results | Reroof Building
4032 (Roofing MACC) Contract Duration: 180 Days |
Drawings Specifications |
|
| CP0936M | Project Bid. Awaiting Bid Results | Replace Paint
Booth, B-250 (Cherry Point Mechanical MACC) Contract Duration: 300 Days ***Site visit 2/2/10 @ 9am. Meet at ROICC Office.*** |
Drawings Specifications |
Amendment1 Bid Pushed Back to 3/4 Amendment2 Amend2Drwgs |
| 09-0179 | Project Bid. Awaiting Bid Results | Correct Sewage
Flow STT30 & STT47 (Mechanical MACC) Contract Duration: 360 Days |
Drawings Specifications |
Amendment1 Amendment2 |