Available Plans

 

Adobe Acrobat Reader

 required to view downloads

get it here

Humphrey Mechanical, Inc. encourages all woman-owned, small disadvantaged, HUBZone, veteran-owned and

service disabled veteran-owned small businesses to provide quotations for all jobs that we are bidding.

Humphrey Mechanical, Inc. is an equal opportunity employer.

Job Number Bid Date Title and Location Drawings and Specs Amendments
08/1414 8/20/08
10:00 AM
Design/Build P1096 Child Development Center
(CLNC 8A MACC)
Contract Duration: 555 Days
Specifications
GeoTech Report
Amendment1
Floor Plan
Amendment2
Amendment3
Amendment4
RM60808 8/21/08
2:00 PM
Repair High Pressure Steam Line, B-137
(Cherry Point Mech MACC)
Contract Duration: 60 Days
Drawings
Specifications
 
99-4236 8/26/08
3:00 PM
Major Interior/Exterior Repairs, HQ Building FC400
(CLNC Mech MACC)
Contract Duration: 540 Days
Title & Civil Drawings
Civil Drawings
Arch & Struct Drawings
FP,P,M&E Drawings
Specifications
Amendment1
Amendment2
Amendment3
Amendment4
Amendment5
Amendment6
Amendment7
08-0500 8/27/08
1:00 PM
Building 437 HVAC Renovations & Replace Deep Fat Fryer Exhaust System at Building 211
(CLNC Mech MACC)
Contract Duration:
Bldg 437-180 Days
Bldg 211-90 Days
***This project is an FY08 Straddle Project; proposal prices shall be valid for 180 days after receipt of proposals.***
***Special conditions for Bldg 211-All material must be on-site prior to starting work. Coordinate with Mess Hall personnel is required; kitchen must remain operational during construction.  Contractor shall verify all existing dimensions.***
Bid Form
Scope of Work
Drawings
Amendment1
08-0185 8/27/08
2:00 PM
P1220B Electric Infrastructure Improvement, Wallace Creek
(CLNC Mech MACC)
Contract Duration: 180 Days
***Pre-proposal conference-Monday, August 11 @ 9AM.  Meet at Conference Room of Bldg 1005.  Site visit will follow.
Drawings Amendment1
Amendment2
04-2364 8/28/08
2:00 PM
Replace FRP Condensate Return Lines FC100 & FC200
(CLNC Mech MACC)
Contract Duration: 365 Days
Steam must stay operatoinal during construction. Provide two 10 hour steam outages & one 8 hour outage to reroute steam & condensate pipe where indicated.  See drawing sheet M-03A.
Drawings
Specifications
Ref Drwgs 1of2
Ref Drwgs 2of2
 
08-0504 8/29/08
1:00 PM
Building 520 Electrical Modifications
(CLNC Mech MACC)
Contract Duration: 150 Days
***This project is an FY08 Straddle Project.  Proposals must be valid for 180 days after receipt of proposals.  Some work to be accomplished within an ACM area.***
Scope of Work
Drawings
 
08-0115 9/3/08
3:00 PM
M231 Boiler Plant Building
(CLNC Mech MACC)
Contract Duration: 180 Days
Contractor must provide temp domestic hot water for domestic water outages lasting longer than 8 hours.
***This project is a FY08 Straddle Project. Proposals for this project will not expire until 180 days after receipt of proposals.***
Drawings
Specifications
Ref Drwgs
 
2694331 9/10/08
2:00 PM
Repairs to B-160, Cherry Point
(GC MACC)
Contract Duration: 360 Days
Drawings1of2
Drawings2of2
Specifications
 
08-0085 Project Bid.  Awaiting Bid Results Installation of E85 Tank
(CLNC Mech MACC)
Contract Duration: 240 Days
Drawings
Specifications
Amendment1
Amendment2
RM118-06 Project Bid.  Awaiting Bid Results Upgrade Hazardous Gas Detection System, B-4225
(Cherry Point Mech MACC)
Contract Duration: 240 Days
Drawings
Specifications
Amendment1
CP0715R Project Bid.  Awaiting Bid Results Replace Paint Booth, B-131
(Cherry Point Mech MACC)
Contract Duration: 300 Days
Drawings
Specifications
Amendment1
Amendment2
Amendment3
N40085-08-B-8459 Project Bid.  Awaiting Bid Results TECOM (SOI) Interim Facilities at Camp Geiger
(CLNC Small Business Set Aside)
Contract Duration: 300 Days
Drawings
Specifications
Amendment1
08-0002 Project Bid.  Awaiting Bid Results Major Interior/Exterior Repairs, BEQ HP-560
(CLNC Mech MACC)
Contract Duration: 365 Days
Contractor may not begin work in the building until 1/15/09.  This is a FY08 straddle project.  Proposals for this project will not expire until 180 days after receipt of proposals.
Drawings
Specifications
Amendment1
Amendment2
Amendment3
Amendment4
08-0491 Project Bid.  Awaiting Bid Results Replace Underground Cables Along Curtis Road
(CLNC Mech MACC)
Contract Duration: 120 Days
Scope of Work
Drawings
Amendment1
08-0009 Project Bid.  Awaiting Bid Results HVAC Repairs to HP200 Area Barracks
(CLNC Mech MACC)
Contract Duration: 270 Days
Drawings
Specifications
Amendment1
Amendment2
08-0050 Project Bid.  Awaiting Bid Results HVAC Repairs, HP235 and HP245
(CLNC Mech MACC)
Contract Duration: 270 Days
***Dual temp system will remain in operation for the duration of the project except for a 2 week period when modifications are made to the central chiller plant.  Only 1 AHU per bldg may be taken off-line for replacement at a time throughout the duration of the project.
Drawings
Specifications
Amendment1
Amendment2
08-0134 Project Bid.  Awaiting Bid Results Lighting For Playing Fields Near Building 40
(CLNC Mech MACC)
Contract Duration: 120 Days
Drawings Amendment1
WR4449318 Project Bid.  Awaiting Bid Results Replace Compressor Cooling System, B-250
(Cherry Point Mech MACC)
Contract Duration: 90 Days
Scope of Work Amendment1
N40085-08-R-8443 Project Bid.  Awaiting Bid Results Seed Project: Building 315 Add Heat Pumps
(CLNC Mech Seed Project)
Contract Duration: 180 Days
Drawings
Specifications
Proposal Documents
Amendment1
Amendment2
Amendment3
Amendment4
Amendment5
Amendment6
07-0180 Project Bid.  Awaiting Bid Results Electrical & Mechanical Upgrades, Building 24
(CLNC Mech MACC)
Contract Duration: See Amendment #1.
Electrical outages shall be closely coordinated.
Drawings
Specifications
Amendment1
Amendment2
Amendment3
Amendment4
WR3608525 Project Bid.  Awaiting Bid Results Replace HVAC Systems, B-3452
(Cherry Point Mech MACC)
Contract Duration: 240 Days
Drawings
Specifications
 
08-0426 Project Bid.  Awaiting Bid Results Replace AC System, AS204
(CLNC Mech MACC)
Contract Duration: 180 Days
Scope of Work
Drawings
Amendment1
Amendment2
C01-01 Project Bid.  Awaiting Bid Results Repairs to Industrial Waste System, B-137
(Cherry Point Mech MACC)
Contract Duration: 330 Days
Drawings
Specifications
Amendment1
Amend1Drwgs
Amend1Specs
Amendment2
Amendment3
Amendment4
Amendment5
Amendment6